Step 1 – Drying time If you’re tiling onto new cement render, the render must be a minimum of 2 weeks old (3 weeks for swimming pools) to enable movement caused by drying shrinkage to have taken place. Step 2 – Ensure the render is flat and firm When tiling onto cement render, ensure […]
Step 1 – Ensure your screed is dry Before laying onto Calcium Sulfate screeds it is vital to ensure that the moisture content is at the correct level for the required floor finish. Typical values for moisture sensitive floor finishes are less than 0.5% Water by Weight (w/w) or less than 75% relative humidity (RH) […]